Skip to content

chore(deps): bump faraday from 1.10.4 to 1.10.5

4dcf50f
Select commit
Loading
Failed to load commit list.
Open

chore(deps): bump faraday from 1.10.4 to 1.10.5 #157

chore(deps): bump faraday from 1.10.4 to 1.10.5
4dcf50f
Select commit
Loading
Failed to load commit list.
coqbot-app / GitLab CI job almalinux-8-master (branch) completed Feb 12, 2026 in 0s

Test has failed on GitLab CI

This job is allowed to fail.

We show below the last 40 lines of the trace from GitLab (the complete trace is available here).

Details

2026-02-12T15:47:01.886521Z 01O               ----------
2026-02-12T15:47:01.886525Z 01O               pid:
2026-02-12T15:47:01.886528Z 01O                   1038
2026-02-12T15:47:01.886530Z 01O               retcode:
2026-02-12T15:47:01.886533Z 01O                   0
2026-02-12T15:47:01.886547Z 01O               stderr:
2026-02-12T15:47:01.886549Z 01O               stdout:
2026-02-12T15:47:01.886550Z 01O        ----------
2026-02-12T15:47:01.886552Z 01O                  ID: postfix-init-service-running-postfix
2026-02-12T15:47:01.886555Z 01O            Function: service.running
2026-02-12T15:47:01.886556Z 01O                Name: postfix
2026-02-12T15:47:01.886558Z 01O              Result: True
2026-02-12T15:47:01.886639Z 01O             Comment: Service postfix has been enabled, and is in the desired state
2026-02-12T15:47:01.886753Z 01O             Started: 15:47:01.355992
2026-02-12T15:47:01.886755Z 01O            Duration: 160.984 ms
2026-02-12T15:47:01.886832Z 01O             Changes:   
2026-02-12T15:47:01.887303Z 01O               ----------
2026-02-12T15:47:01.887416Z 01O               postfix:
2026-02-12T15:47:01.887473Z 01O                   True
2026-02-12T15:47:01.887593Z 01O        
2026-02-12T15:47:01.887675Z 01O        Summary for local
2026-02-12T15:47:01.887774Z 01O        -------------
2026-02-12T15:47:01.888398Z 01O        Succeeded: 29 (changed=28)
2026-02-12T15:47:01.888515Z 01O        Failed:     2
2026-02-12T15:47:01.888622Z 01O        -------------
2026-02-12T15:47:01.888637Z 01O        Total states run:     31
2026-02-12T15:47:01.889028Z 01O        Total run time:   11.183 s
2026-02-12T15:47:02.294449Z 01E >>>>>> ------Exception-------
2026-02-12T15:47:02.294453Z 01E >>>>>> Class: Kitchen::ActionFailed
2026-02-12T15:47:02.294454Z 01E >>>>>> Message: 1 actions failed.
2026-02-12T15:47:02.294455Z 01E >>>>>>     Converge failed on instance <default-almalinux-8-master>.  Please see .kitchen/logs/default-almalinux-8-master.log for more details
2026-02-12T15:47:02.294456Z 01E >>>>>> ----------------------
2026-02-12T15:47:02.294456Z 01E >>>>>> Please see .kitchen/logs/kitchen.log for more details
2026-02-12T15:47:02.294457Z 01E >>>>>> Also try running `kitchen diagnose --all` for configuration
2026-02-12T15:47:02.755590Z 00O 
2026-02-12T15:47:02.755594Z 00O+
2026-02-12T15:47:02.756467Z 00O+Cleaning up project directory and file based variables
2026-02-12T15:47:03.326012Z 00O 
2026-02-12T15:47:03.326018Z 00O+
2026-02-12T15:47:06.547681Z 00O ERROR: Job failed: exit code 1