Skip to content

chore(deps): bump faraday from 1.10.4 to 1.10.5

4dcf50f
Select commit
Loading
Failed to load commit list.
Open

chore(deps): bump faraday from 1.10.4 to 1.10.5 #157

chore(deps): bump faraday from 1.10.4 to 1.10.5
4dcf50f
Select commit
Loading
Failed to load commit list.
coqbot-app / GitLab CI job almalinux-9-master (pull request) completed Feb 12, 2026 in 0s

Test has failed on GitLab CI

This job is allowed to fail.

We show below the last 40 lines of the trace from GitLab (the complete trace is available here).

Details

2026-02-12T14:58:16.297768Z 01O               ----------
2026-02-12T14:58:16.297771Z 01O               pid:
2026-02-12T14:58:16.297779Z 01O                   1274
2026-02-12T14:58:16.297836Z 01O               retcode:
2026-02-12T14:58:16.297941Z 01O                   0
2026-02-12T14:58:16.298067Z 01O               stderr:
2026-02-12T14:58:16.298160Z 01O               stdout:
2026-02-12T14:58:16.298303Z 01O        ----------
2026-02-12T14:58:16.298337Z 01O                  ID: postfix-init-service-running-postfix
2026-02-12T14:58:16.298427Z 01O            Function: service.running
2026-02-12T14:58:16.298567Z 01O                Name: postfix
2026-02-12T14:58:16.298666Z 01O              Result: True
2026-02-12T14:58:16.298748Z 01O             Comment: Service postfix has been enabled, and is in the desired state
2026-02-12T14:58:16.298871Z 01O             Started: 14:58:15.681479
2026-02-12T14:58:16.298968Z 01O            Duration: 232.951 ms
2026-02-12T14:58:16.298992Z 01O             Changes:   
2026-02-12T14:58:16.299098Z 01O               ----------
2026-02-12T14:58:16.299563Z 01O               postfix:
2026-02-12T14:58:16.299578Z 01O                   True
2026-02-12T14:58:16.299581Z 01O        
2026-02-12T14:58:16.299584Z 01O        Summary for local
2026-02-12T14:58:16.299674Z 01O        -------------
2026-02-12T14:58:16.300298Z 01O        Succeeded: 29 (changed=28)
2026-02-12T14:58:16.300390Z 01O        Failed:     2
2026-02-12T14:58:16.300477Z 01O        -------------
2026-02-12T14:58:16.300570Z 01O        Total states run:     31
2026-02-12T14:58:16.300885Z 01O        Total run time:    8.463 s
2026-02-12T14:58:16.765552Z 01E >>>>>> ------Exception-------
2026-02-12T14:58:16.765557Z 01E >>>>>> Class: Kitchen::ActionFailed
2026-02-12T14:58:16.765558Z 01E >>>>>> Message: 1 actions failed.
2026-02-12T14:58:16.765559Z 01E >>>>>>     Converge failed on instance <default-almalinux-9-master>.  Please see .kitchen/logs/default-almalinux-9-master.log for more details
2026-02-12T14:58:16.765560Z 01E >>>>>> ----------------------
2026-02-12T14:58:16.765561Z 01E >>>>>> Please see .kitchen/logs/kitchen.log for more details
2026-02-12T14:58:16.765562Z 01E >>>>>> Also try running `kitchen diagnose --all` for configuration
2026-02-12T14:58:17.009672Z 00O 
2026-02-12T14:58:17.009677Z 00O+
2026-02-12T14:58:17.010527Z 00O+Cleaning up project directory and file based variables
2026-02-12T14:58:17.636091Z 00O 
2026-02-12T14:58:17.636096Z 00O+
2026-02-12T14:58:21.098927Z 00O ERROR: Job failed: exit code 1