chore(deps): update go dependencies#341
Open
red-hat-konflux[bot] wants to merge 1 commit into
Open
Red Hat Konflux / Red Hat Konflux / timestamp-authority-v1-3-on-pull-request
failed
Jul 4, 2026 in 2m 20s
Failed
Red Hat Konflux/timestamp-authority-v1-3-on-pull-request has failed.
Details
- Namespace: rhtas-tenant
- PipelineRun: timestamp-authority-v1-3-on-pull-request-sgz8h
Task Statuses:
| Status | Duration | Name |
|---|---|---|
| 🟢 Succeeded | 4 seconds | |
| 🟢 Succeeded | 4 seconds | |
| 🟢 Succeeded | 12 seconds | |
| 🟢 Succeeded | 8 seconds | |
| 🟢 Succeeded | 37 seconds | |
| 🔴 Failed | 48 seconds | |
| 🔴 Failed | 1 minute |
Loading