Skip to content

chore(deps): update docker images#331

Open
red-hat-konflux[bot] wants to merge 1 commit into
mainfrom
konflux/mintmaker/main/docker-deps
Open

chore(deps): update docker images#331
red-hat-konflux[bot] wants to merge 1 commit into
mainfrom
konflux/mintmaker/main/docker-deps

chore(deps): update docker images

0115c79
Select commit
Loading
Failed to load commit list.
Red Hat Konflux / Red Hat Konflux / tas-components-enterprise-contract / pr group completed Jul 1, 2026 in 16m 38s

Warning

Integration test for pr group snapshot tas-components-20260701-021441-076 and scenario tas-components-enterprise-contract has warning(s)

Details


Task Duration Test Suite Status Details Note
collect-keyless-params 9s ✔️ Reason: Succeeded ✔️ Reason: Succeeded
verify 1m23s ⚠️ WARNING ✔️ 1397 success(es)
⚠️ 81 warning(s)

The group snapshot is generated for pr group konflux/mintmaker/main/docker-deps and the component snasphots as below:

Component Snapshot BuildPipelineRun PullRequest
certificate-transparency-go tas-components-20260701-005637-000 certificate-transparency-go-on-pull-request-x9tkz certificate-transparency-go
database tas-components-20260701-020650-000 database-on-pull-request-q8wj6 trillian
logserver tas-components-20260701-020716-000 logserver-on-pull-request-6nwq8 trillian
redis tas-components-20260701-020649-000 redis-on-pull-request-r6t2h trillian
backfill-redis tas-components-20260701-014703-000 backfill-redis-on-pull-request-grb8p rekor
fulcio-server tas-components-20260701-015127-000 fulcio-server-on-pull-request-pfl77 fulcio
logsigner tas-components-20260701-020646-000 logsigner-on-pull-request-cbhpv trillian
rekor-server tas-components-20260701-015809-000 rekor-server-on-pull-request-rdn59 rekor
timestamp-authority tas-components-20260701-020505-000 timestamp-authority-on-pull-request-r9hlc timestamp-authority