Skip to content

every 90 minutes and every 36 hours compile to hourly and daily schedules #80646

Backlog

Description

@sholub-dev

schedule: every 90 minutes and every 36 hours compile to schedules that run hourly and daily

Analysis

Minute and hour intervals that a cron step cannot express are accepted and compile without a warning to a schedule with a different cadence.

Repro, with on.schedule set to each value and gh aw compile:

schedule: compiled cron actual runs
every 90 minutes 56/90 * * * * once an hour, at :56
every 36 hours 33 */36 * * * once a day, at 00:33 UTC
every 45 minutes M/45 * * * * once or twice an hour, 45 and 15 minutes apart, depending on the scattered offset
every 7 hours 13 */7 * * * 00:13, 07:13, 14:13, 21:13, then 00:13 (a 3 hour gap)

Cron steps restart at the top of each hour (minutes) and each day (hours), so only intervals that divide 60 (minutes) or 24 (hours) repeat evenly.

docs/src/content/docs/reference/schedule-syntax.md lists the valid values (5m, 10m, 15m, 20m, 30m and 1h, 2h, 3h, 4h, 6h, 8h, 12h), and specs/fuzzy-schedule-specification.md lists every 5h (not a factor of 24) as error ERR-INTERVAL-002. validateMinimumInterval in pkg/parser/schedule_parser.go only checks the 5 minute minimum.

Expected: compilation fails with a message that names the valid intervals.

Reproducible on main at b1c6690.

Implementation plan

  1. pkg/parser/schedule_parser.go: after the 5 minute check in validateMinimumInterval, return an error when a minute interval does not divide 60 or an hour interval does not divide 24. Both the short (every 90m) and long (every 90 minutes) forms go through this function. Suggested messages: minute interval 90 is not supported: it must divide 60 evenly (e.g. 5, 10, 15, 20, 30, 60). Use a cron expression for other cadences and hour interval 36 is not supported: it must divide 24 evenly (e.g. 1, 2, 3, 4, 6, 8, 12, 24). Use 'every N days' or a cron expression for other cadences.
  2. pkg/parser: add a table test that rejects every 90 minutes, every 45m, every 120m, every 36 hours, every 5 hours, every 7h on weekdays and accepts every 5 minutes through every 60m and every 1h through every 24h.
  3. No docs change needed; the reference page already lists the valid values.

Activity

  1. locked and limited conversation to collaborators on Nov 24, 2026
  2. unlocked this conversation on Nov 24, 2026
  3. sholub-dev commented on Nov 24, 2026

    @sholub-dev
    Author

    Day intervals have the same problem. The day-of-month step restarts every month, so these do not run at the cadence the docs describe (docs/src/content/docs/reference/schedule-syntax.md):

    schedule: compiled cron docs say actual runs
    bi-weekly 40 7 */14 * * "Every 14 days" days 1, 15 and 29 of the month, so 2 to 3 days between the last run of a month and the first of the next
    tri-weekly 36 4 */21 * * every 21 days days 1 and 22, then day 1 again about 9 days later
    every 2 days 49 11 */2 * * every 2 days odd days only, so back to back runs on the 31st and the 1st

    Reproducible on main at ba22181 (schedule_fuzzy_scatter.go emits */14, */21 and */N in the day-of-month field).

  4. locked and limited conversation to collaborators on Nov 24, 2026
  5. unlocked this conversation on Nov 24, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions