Owner action

You decide (MAJOR: RepID). Draft. Do not auto-merge. No flag: from merge on, a contract held by two runs pays out once.

What happened on 2026-07-08 [V SQL]

One settlement, contract 7ca47a1d, went through applyServiceFulfilledDeltas twice, 3.5 s apart:

run 1 run 2
provider SERVICE_FULFILLED +10, 1595→1605 +10, 1595→1605 (read before run 1's write landed)
buyer SERVICE_FULFILLED +5, 1030→1035 +5, 1035→1040
service_fulfilled_settled outbox row 1563 1564

So the buyer took +5 twice. The provider's score moved once, but its ledger holds two +10 rows over a single move, so the ledger overstates. The two outbox rows produced three giveFeedback txs (two for 1564 come from the inline/worker double that #1556 fixes).

Scope: of 724 contracts with fulfil events, this is the only double-run [V SQL]. None in the last 30 days.

One more contract (16a6eb16, 2026-06-27) has two buyer rows with different deltas (+5, +20) and a single outbox row. That is not this pattern. Not investigated here.

It was test traffic. The contract came from an E2E buy-loop run (payload "Eligible buy-loop 3", mock validators, 16:xx and 20:xx UTC, not the 12:00Z cron). The ledger effects were real, though: the buyer's row took +5 twice.

Client retry, or server? [V SQL + code]

  • It was not a re-sent POST /contracts/:id/fulfill. That route is guarded, and it runs no validation. Here, validation ran twice: three pcp_validation calls at 20:17:32.17–32.50 and three more at 32.78–33.09, followed by the two delta rounds at 32.66 and 36.28. llm_call_log names validators, not contracts, so this is strong timing evidence, not proof.
  • So it was two handler runs. Two server entry points call processOne: the cascade worker's tick, and POST /api/v1/agent/process-contracts, which the runner (scripts/demo/run-e2e-transactions.ts) calls once per contract with no retry in the committed code.
  • Cannot tell whether the second run was a script retry (the exact "Eligible buy-loop" variant is in no commit) or the script's call racing a worker tick. Nothing records the request.
  • Either way, two runs became two payouts only because of the missing guard. A server must not depend on its clients calling once.

Why [V code]

ServiceHandlerBase.claimNextContract "claims" by writing metadata.claimed_at and leaves status = 'escrowed'. A second claimer racing it also matches .eq('status','escrowed') and also gets the row. The comment said "lost race ⇒ 0 rows", which is true only for a row that had already moved on. Then processOne's escrowed → fulfilled update had no status guard, so both runs transitioned and both applied the deltas. That contract's metadata says claimed_by_handler: verification, so it took this path.

POST /contracts/:id/fulfill was already right: it transitions with .eq('status','escrowed') and applies deltas only when a row comes back.

Fix

The handler's fulfil transition is now .eq('status','escrowed').select('id').maybeSingle(). Only the run that makes the transition applies the deltas. The losing run logs and returns processed: false. The claim comment is corrected.

Not changed: the claim still is not exclusive, so a second run still does the work (LLM validation) and then stands down. The disputed branch inserts its queue row before transitioning, so a double run could still file two dispute rows; it moves no RepID. Making the claim exclusive is the follow-up that removes both.

Why not dedupe on (contract_id, x402_payment_id)? That would catch the outbox rows but not the score rows. The transition guard covers both, because one state change means one round. A unique index would also be a good second guard; it is DDL, so it is your call.

Tests

tests/service-handler-fulfil-once.test.ts: two concurrent processOne runs on one contract (both claim before either transitions), with a fake table that honours the update's filters the way PostgREST does.

  • on origin/main's handler: 2 of 3 fail (deltas applied twice; a contract that moved on still earns). The single-run control passes on both.
  • with the fix: 3/3, plus service-handler-claim-order and cascade-settlement-worker, 20/20. tsc --noEmit clean.

CI and review

  • test was red on a9495997, and REAL, from this change: tests/services/service-handler-base.test.ts serves maybeSingle() from a queue and had no entry for the transition's new row read, so every fulfil read as a lost race. Fixed in d6d324cb by queueing that row. The assertions are unchanged, and that suite plus the three above pass (27/27).

  • Grok (fenced lane, v4) r1 on a9495997: NO_FINDINGS. The source is unchanged since then; only the test double moved.

  • Strix (LOW): confirmed, fixed in 1d70cc21. The dispute branch still inserted a dispute_validation_queue row, then set disputed with no status guard. Two racing runs could each file a dispute row, and the dispute worker applies deltas per row, so the contract was charged twice. A run could also flip a contract another run had fulfilled. Now the disputed transition is guarded and runs before the insert, so only the winner files a dispute. If the insert fails, the contract is put back to escrowed so a later cycle retries. Two new tests fail on the previous source; the handler suites pass 29/29, zkp-audit-service 43/43. Strix's threads are replied to and resolved.

  • No Grok round covers 1d70cc21 yet.

Related: #1556 fixes the inline/worker double write of one outbox row. This PR fixes the double settlement that produced the second outbox row.

🤖 Generated with Claude Code

…ny runs hold it

The handler's claim writes metadata and leaves status 'escrowed', so two concurrent runs both hold
one contract (its comment said "lost race => 0 rows", which is true only for a row that moved on).
The escrowed -> fulfilled update had no status guard, so both runs applied the deltas.

Measured: contract 7ca47a1d (2026-07-08) got two rounds 3.5 s apart: two outbox rows, three
on-chain writes, the buyer +5 twice (1030->1035->1040), and the provider ledger shows two +10 rows
over one 1595->1605 move. 1 of 724 contracts with fulfil events shows this double-run.

Fix: the transition is conditional on status 'escrowed' and returns the row; only the run that
makes it applies the deltas. POST /contracts/:id/fulfill already did this.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
…ransition's row

processOne now reads the escrowed -> fulfilled update's row (maybeSingle); the queue-based double in
tests/services/service-handler-base.test.ts had no entry for it, so every fulfil read as a lost race.
Assertions unchanged.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@strix-security

strix-security Bot commented Nov 16, 2026 •

Copy link
Copy Markdown

Strix Security Review

✅ No open security findings.

PR summary: Settlement fix: `ServiceHandlerBase.processOne` now only applies the SERVICE_FULFILLED payout when it is the run that actually transitions a contract escrowed → fulfilled, and the dispute branch was reordered so the disputed transition is guarded the same way before a dispute queue row is filed. Adds a test with a PostgREST-like fake table proving two concurrent runs settle once.

Review summary

The handler-side settlement race this PR targets is genuinely closed: the escrowed → fulfilled transition is now a single conditional UPDATE whose loser returns processed:false before any delta, so two runs holding one contract can no longer apply SERVICE_FULFILLED twice, and the dispute branch added in the last commit is mutually exclusive with it. Reading through the rest of the change reached path turned up one remaining hole: the same once-per-contract invariant is not enforced off the handler. "Dispute route enqueues one validation row per request and the dispute worker settles each row, so a party can re-settle the same contract repeatedly" — POST /contracts/:id/dispute re-opens a fulfilled or already-disputed contract with no status precondition and files a new queue row on every call, and the dispute worker settles each row independently, so one contract can be made to record many provider/buyer RepID rounds against a counterparty that never acted. I also ruled out three suspicions after tracing them: the DB status trigger forbids returning a paid contract to escrowed, the new dispute put-back cannot touch a fulfilled row (and is in fact a dead disputed → escrowed write the trigger rejects, a liveness defect rather than a payout one), and the non-exclusive claim's duplicate LLM work is a pre-existing cost the new stand-down strictly reduces.

Ruled out (3)
  • Can a contract be moved back into `escrowed` after it was fulfilled, so a second `processOne` run pays the same contract again?
    The service_contracts status trigger admits `escrowed` only from `pending` and makes settled/resolved/expired/cancelled terminal, so the unguarded status writes in the escrow, cancel and resolve routes cannot re-arm a paid contract.
  • Does the new dispute put-back on an insert failure resurrect a contract or allow a second settlement?
    It is gated on `status='disputed'` so it cannot touch a fulfilled row, and that transition is rejected by the status trigger anyway — a dead recovery path that applies no deltas.
  • Can an outside party exploit the non-exclusive claim to exhaust the shared LLM validation quota?
    The duplicate work is pre-existing and costs the same per request either way, the sustained-burn path does not depend on claim exclusivity, and the new stand-down reduces a duplicate run's impact from double payout to discarded work.
Review history (2)
  • Review 2 · 1d70cc2 · Nov 16 05:37 UTC · Nothing new
  • Review 1 · d6d324c · Nov 16 05:10 UTC · Found 1 Low Vulnerability

Review 2 on this PR · 1d70cc2 · requested Nov 16 05:32 UTC on a new commit


Reviewed by Strix
Re-run review · Configure security review settings · Try a deeper review with @strix-security /deep

@strix-security strix-security Bot left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Strix flagged a new security finding below. See the pinned summary comment for the full PR status.

Comment thread src/services/service-handler-base.ts Resolved
Comment thread src/services/service-handler-base.ts Resolved
The fulfil transition was guarded, but the dispute branch still inserted a dispute_validation_queue
row first and then set status 'disputed' with no status guard. Two runs routing one contract to
dispute each filed a row, and the dispute worker applies deltas per row, so the contract was charged
twice; a run could also flip a contract another run had fulfilled.

Now: the disputed transition is conditional on status 'escrowed' and returns the row; only the run
that makes it files the dispute. If the queue insert then fails, the contract is put back to
escrowed (guarded on 'disputed') so a later cycle retries; if that also fails it is visibly stuck,
never paid twice.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@DealAppSeo
DealAppSeo merged commit 5e3cb78 into main Nov 16, 2026
19 checks passed
@DealAppSeo
DealAppSeo deleted the claude/r1b-fulfil-once branch November 16, 2026 08:52
@DealAppSeo

Copy link
Copy Markdown
Owner Author

Grok review (fenced lane) round 2 on 1d70cc21: NO_FINDINGS

I ran it through the fenced wrapper (grok-review.v4.mjs, reviewer profile: read-only, MCP off). The wrapper accepted the answer: the nonce matched, the checkout was on 1d70cc21030de3c02a0bf6814793c42b9f59ccba, and Grok opened every file it cites. Round 1 was on a9495997. This round covers the two commits since then: the guarded dispute branch (Strix finding) and the test-double fix.

The spec Grok checked:

  • Fulfilled path (from round 1): the escrowed → fulfilled update requires the contract to still be status = 'escrowed'. Deltas apply only when that update returned a row, so they apply once per contract.
  • Dispute path (new): the escrowed → disputed update has the same status guard, and it now runs before the dispute_validation_queue insert. If it returns no row, no dispute row is filed. If the insert fails, the contract is put back to escrowed (guarded on status = 'disputed') and the run throws, so a later cycle retries.
  • Tests: two concurrent runs that both route to dispute file one row. A contract that another run has already fulfilled is not flipped to disputed.

Evidence Grok read:

  • r1b.r2.test-output-head.txt: 12/12 pass on head.
  • r1b.r2.test-output-old-src.txt: the same tests against the pre-fix processOne. The concurrent-dispute test fails with two dispute rows for one contract.

Result: NO_FINDINGS, nothing listed as not checked.

My adjudication: I agree with the spec result, and found one remaining risk outside it. It is not blocking, and this PR does not make it worse:

  • The risk: a dispute-row insert that commits on the database but whose response is lost reads as an error. The contract is then put back to escrowed, and a retry would file a second row.
  • This existed before the PR. The old order (insert, then transition) had the same exposure. It also had a second double-row path, a failed transition after a good insert, which this PR removes.
  • dispute_validation_queue has no unique index on contract_id [V: only the primary key, plus plain indexes on status and contract_id].
  • It has never happened. 0 of the 34 contracts with a dispute row have more than one [V, read-only SQL].
  • Two possible closes, neither in this PR: check for an existing row before the put-back, or add a partial unique index (DDL, so Sean's).

Not merged, and auto-merge is off.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment