Skip to content

doc: add UV setup details to README.md#11823

Open
ulysses4ever wants to merge 2 commits into
haskell:masterfrom
artem-hermes-bot:hermes-artem/uv-setup-docs
Open

doc: add UV setup details to README.md#11823
ulysses4ever wants to merge 2 commits into
haskell:masterfrom
artem-hermes-bot:hermes-artem/uv-setup-docs

Conversation

@ulysses4ever
Copy link
Copy Markdown
Collaborator

This is towards #11818 @philderbeast @geekosaur Since there was no specification for what the new piece of documentation should achieve, I unleashed my AI bot on it. The result looks legit but maybe you guys had something different in mind?


Template B: This PR does not modify behaviour or interface

E.g. the PR only touches documentation or tests, does refactorings, etc.

Include the following checklist in your PR:

  • Patches conform to the coding conventions.
  • Is this a PR that fixes CI? If so, it will need to be backported to older cabal release branches (ask maintainers for directions).

@ulysses4ever ulysses4ever force-pushed the hermes-artem/uv-setup-docs branch from f5bbd02 to b00904a Compare May 14, 2026 00:10
Comment thread doc/README.md Outdated
@ulysses4ever ulysses4ever added the squash+merge me Tell Mergify Bot to squash-merge label May 22, 2026
@ulysses4ever
Copy link
Copy Markdown
Collaborator Author

ulysses4ever commented May 22, 2026

@hasufell can you help with the release pipeline: I don't understand why it runs on PRs like this one --- I thought you said it needs a special label? Also, why it fails here... (see GitHub Actions pane above or here's a direct link to one of the many failing jobs: https://github.com/haskell/cabal/actions/runs/26291120700/job/77391368065?pr=11823)

@mergify mergify Bot added ready and waiting Mergify is waiting out the cooldown period merge delay passed Applied (usually by Mergify) when PR approved and received no updates for 2 days queued labels May 22, 2026
@mergify
Copy link
Copy Markdown
Contributor

mergify Bot commented May 24, 2026

Merge Queue Status

This pull request spent 1 hour 56 minutes 4 seconds in the queue, including 1 hour 23 minutes 57 seconds running CI.

Waiting for any of
  • check-neutral = Validate post job
  • check-skipped = Validate post job
  • check-success = Validate post job
All conditions
  • any of [🛡 GitHub branch protection]:
    • check-neutral = Validate post job
    • check-skipped = Validate post job
    • check-success = Validate post job
  • #approved-reviews-by >= 2 [🛡 GitHub branch protection]
  • #changes-requested-reviews-by = 0 [🛡 GitHub branch protection]
  • #review-threads-unresolved = 0 [🛡 GitHub branch protection]
  • any of [🛡 GitHub branch protection]:
    • check-success = Doctest Cabal
    • check-neutral = Doctest Cabal
    • check-skipped = Doctest Cabal
  • any of [🛡 GitHub branch protection]:
    • check-success = Meta checks
    • check-neutral = Meta checks
    • check-skipped = Meta checks
  • any of [🛡 GitHub branch protection]:
    • check-success = docs/readthedocs.org:cabal
    • check-neutral = docs/readthedocs.org:cabal
    • check-skipped = docs/readthedocs.org:cabal
  • any of [🛡 GitHub branch protection]:
    • check-success = fourmolu
    • check-neutral = fourmolu
    • check-skipped = fourmolu
  • any of [🛡 GitHub branch protection]:
    • check-success = hlint
    • check-neutral = hlint
    • check-skipped = hlint
  • any of [🛡 GitHub branch protection]:
    • check-success = Bootstrap post job
    • check-neutral = Bootstrap post job
    • check-skipped = Bootstrap post job
  • any of [🛡 GitHub branch protection]:
    • check-success = whitespace
    • check-neutral = whitespace
    • check-skipped = whitespace
  • any of [🛡 GitHub branch protection]:
    • check-success = Check sdist post job
    • check-neutral = Check sdist post job
    • check-skipped = Check sdist post job
  • any of [🛡 GitHub branch protection]:
    • check-success = Changelogs
    • check-neutral = Changelogs
    • check-skipped = Changelogs

Reason

The merge conditions cannot be satisfied due to failing checks

Failing checks:

Hint

You may have to fix your CI before adding the pull request to the queue again.
If you update this pull request, to fix the CI, it will automatically be requeued once the queue conditions match again.
If you think this was a flaky issue instead, you can requeue the pull request, without updating it, by posting a @mergifyio queue comment.

mergify Bot added a commit that referenced this pull request May 24, 2026
mergify Bot added a commit that referenced this pull request May 24, 2026
@mergify mergify Bot added dequeued and removed queued labels May 24, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

dequeued merge delay passed Applied (usually by Mergify) when PR approved and received no updates for 2 days ready and waiting Mergify is waiting out the cooldown period squash+merge me Tell Mergify Bot to squash-merge

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants