Portfolio manager

A portfolio manager is a weekly flow that decides how your budget is split between projects. It reads the budget, reads your goals, writes a plan of weights, and reports what it asked for. pi-dispatch does the arithmetic and decides whether the plan applies. Deciding what matters this week is judgement, so it lives in a flow you own, not in pi-dispatch.

examples/portfolio-manager/ is a working one to copy. This page says what the harness guarantees, what the flow must not rely on, and how to test it without spending.

How the pieces fit

  1. You set the envelope: a dollar total per window and a floor per project (allocation).
  2. A cron trigger with "portfolio": true runs the flow each Monday (triggers).
  3. The worker writes /job/portfolio.json into the job: the budget's numbers, with no text.
  4. The flow reads it and your priorities.md, and writes /outbox/priorities.json: one weight per project.
  5. The flow posts a report to your channel with its own tools. pi-dispatch sends no notification of its own.
  6. After the job completes, the worker judges the plan and applies it, clamps it or refuses it. The next run's snapshot says which, and the next report opens with it.

Set it up

Copy the example to a folder of its own, make it a git repository with a commit, and edit priorities.md. The example's README has the commands.

Put the manager's folder in a project with a floor. Its own job is governed like any other: it pays from its folder's project, or from _other when the folder is in no project. A plan can give _other weight 0, and then the manager is refused as allocation-cap at its next run. A floor of at least PI_MAX_COST_USD keeps it running. The example uses a project ops:

{ "version": 1, "projects": [
  { "id": "shop", "members": ["github:acme/shop"] },
  { "id": "platform", "members": ["github:acme/platform"] },
  { "id": "ops", "members": ["/home/me/pm"] } ] }
{ "version": 1, "window": "week", "totalUsd": 100,
  "floorsUsd": { "shop": 10, "platform": 10, "ops": 5, "_other": 0 },
  "defaultWeights": { "shop": 1, "platform": 1, "ops": 1, "_other": 1 },
  "delegation": { "enabled": true, "writers": ["operator-session", "portfolio-job"],
                  "maxStepPct": 25, "minIntervalHours": 24, "maxPlanDays": 14 } }

With PI_MAX_COST_USD=2, the ops floor of $5 admits the manager's weekly job even when a plan gives ops weight 0.

What these numbers give

The floors take $25 of the $100. The other $75 is split by weight.

Project Floor Neutral (weights 1, 1, 1, 1) After the fixture plan (3, 2, 1, 0)
shop $10.00 $28.75 $47.50
platform $10.00 $28.75 $35.00
ops $5.00 $23.75 $17.50
_other $0.00 $18.75 $0.00

The neutral split does not give shop and platform half of the $75 each: ops and _other have a default weight of 1 too, so each of the four takes a quarter.

The fixture plan moves no project by more than $18.75, under the $25.00 step (25% of $100), so it applies whole. A next plan of 1, 6, 1, 0 aims platform at $66.25, a move of $31.25, so it is clamped: every project moves 25/31.25 of the way, to shop $25.00, platform $60.00 and ops $15.00.

The trigger

{ "on": { "type": "cron", "id": "pm-weekly", "pattern": "0 6 * * 1" },
  "run": { "kind": "local", "folder": "/home/me/pm",
           "flow": "portfolio-manager",
           "task": "Plan this week's budget split and report it. Follow the steps of the flow in order.",
           "portfolio": true, "model": "claude-haiku-5-5", "maxTurns": 15,
           "excludeTools": ["edit"],
           "secrets": { "REPORT_GH_TOKEN": "op://ops/pm-report/token",
                        "REPORT_WEBHOOK_URL": "op://ops/pm-report/webhook" } } }
  • The panel's trigger list and /dispatch triggers mark it [portfolio]. After a run, the run's detail shows the plan's outcome and id, and the panel's b view and the insights page show the split it led to.
  • It runs Monday at 06:00 UTC, at the start of the week window. The flow writes no validUntil, so its plan stays in force for maxPlanDays (14 in the example) unless a newer plan replaces it, which outlives a weekly run.
  • Pick the cheapest model that follows the flow's steps, and try it before you rely on it. The model id above is an example. The flow spells out each command for that reason. A plan the model gets wrong is refused (plan-parse-error, plan-invalid) and the job still completes. In a test, a 3B local model ran only the one command fixture flow. A 7B model (qwen2.5:7b) ran this flow: its plan followed priorities.md, applied, and raised a project's weight from 1 to 3 once that project was marked "on fire". It did not on every run: some runs wrote no plan, and one wrote "basis": "null", which was refused. A run that completes without a plan is recorded as plan-absent, and the next report opens with Last plan: refused (plan-absent). A run that stops before it completes (a timeout, a cancel, a failure) records nothing, and the next report still shows the earlier attempt. Give a local model a context of 16k tokens or more: Ollama often defaults to 4096, too small for this flow.
  • It does not set "github": true. That flag hands the job the deployment's GitHub credential: under the default GITHUB_AUTH_SOURCE=gh that is your whole gh login, and a job that reads issue text must not hold a token that can merge. Under a GitHub App the mint refuses a local job anyway.
  • The report token comes through run.secrets instead (secrets): a fine grained token with Issues read on the project repos and Issues write on one tracking repo. Its name is REPORT_GH_TOKEN because GH_TOKEN and GITHUB_TOKEN are reserved for minted forge tokens. Keep only the secret of the channel you use: a reference the resolver cannot read refuses the job.

The report channel

The report goes to the first channel that is set:

  • GitHub: REPORT_GH_TOKEN, plus report-repo and report-issue in the front matter of priorities.md. The script runs gh issue comment <n> --repo <owner/name> --body-file -.
  • A webhook: REPORT_WEBHOOK_URL. The script POSTs { "text": "<markdown>" }, which Slack, Mattermost and Discord's Slack compatible endpoint accept. For another shape, change webhookBody in report.mjs.

A failed post prints report-not-sent: <reason> and the script still exits 0. The job must complete, because the plan in /outbox is collected only after a completed exit.

The example reads milestones from GitHub only. On GitLab or Forgejo, change step 3 of the flow to use glab or tea, which the job image also has, and bind that forge's token the same way.

Egress

With the egress policy on, add the hosts the job talks to in egress-allowlist.conf:

api.github.com
hooks.slack.com

api.github.com is for the GitHub channel and step 3. The second line is your webhook's host. The webhook must be https on port 443, the only port the proxy tunnels to for a listed name. A webhook sink on the worker's own machine is a poor test: the proxy refuses the host's loopback addresses (egress).

What the harness enforces

The flow proposes. The host decides, after the job exits, by the rules in INT-PRIORITIES-PLAN-CONTRACT and DES-DELEGATED-ALLOCATION-INSIDE-ENVELOPE:

  • The envelope. The total is never exceeded, and no project goes below its floor.
  • The step. One plan moves a project by at most maxStepPct of the total. A larger move is clamped.
  • The interval. A plan sooner than minIntervalHours after the last one is refused as plan-too-soon.
  • The basis. A plan must name the plan it saw. If another applied since, it is refused as plan-stale.
  • Validity. A plan lives until its validUntil, at most maxPlanDays. Then the neutral split returns.
  • Writers. portfolio-job must be in delegation.writers, or the job is refused before it costs anything.
  • The audit log and revert. Every plan the job sends, applied or refused, is a row in the audit file and in alloc:log (allocation names the one exception). The panel's ALLOCATION view (b) shows the history, and r on a row reverts to it.

The full rules are REQ-DELEGATED-ALLOCATION, INT-ENVELOPE-FILE-CONTRACT and INT-OUTBOX-CONTRACT.

Turn it off

  • Stop the manager only. Delete its trigger to stop its runs. Removing only "portfolio": true leaves a weekly job that still runs and costs: any plan it writes is refused as plan-not-portfolio, and the split stays as it is.
  • Stop every plan. Set enabled to false with dispatch_envelope_set. The neutral split returns, and a portfolio job is refused as portfolio-no-envelope before it costs anything. An operator plan is refused too.
  • Remove the split. Follow "Several hosts" in allocation: remove PI_ENVELOPE_FILE from every host, then delete the split and its digest: valkey-cli DEL alloc:plan alloc:envelope:expected.

What the snapshot holds

/job/portfolio.json holds ids, numbers and operator labels: the envelope's numbers, the plan in force, this trigger's last attempt, and per project its floor, weight, allocation, spend in the window and runs of the last 7 days. A project member shows as its label, github:acme/shop or local:<folder name>. Money is in micro-dollars (1000000 is one dollar). The shape is INT-CONTAINER-JOB-INPUTS.

It holds no issue text, no titles, no plan reasons and no paths. The next run reads the file as facts, so text that someone else wrote must never reach it. A reason your last plan gave is agent text too, so it is not there.

What the flow must not rely on

  • That its plan applied. The host judges it after the job ends. The report says "requested", and the next run learns the outcome from lastAttempt.
  • That lastAttempt shows a revert. It holds only this trigger's own plans. A revert in the panel shows in the snapshot's plan: its writer is then operator-revert, and the report's "In force" line names it. A revert to the neutral split leaves plan null, and the line says so.
  • That plan.writer wrote the plan. It is the split's last writer. After an envelope edit the worker re-bases the plan onto the new envelope: same plan id and weights, writer envelope-change. The report then says "re-based onto a changed envelope". The plan's author is in the panel's history.
  • That the numbers are exact to the cent mid run. Spend counters include what running jobs still hold, and other jobs settle while the manager runs.
  • That run counts cover the whole fleet. They do only with a run mirror (PI_WORKER_NAME set on every host). fleet.runsComplete says which.
  • That its reasons reach you unaltered. A reason holding a control or format character refuses the whole plan, the panel shows the rest escaped, and the snapshot never shows them.
  • That it can compute dollars. It writes weights. The host ignores any dollar amount, and models misjudge shared budgets.

Threat model

The manager reads text other people wrote, so assume a prompt injection can steer its weights. That is bounded by arithmetic, not by trust: a plan cannot raise the total, break a floor or move more than one step per interval, and you can revert it (SECURITY.md, CONST-ISSUE-TEXT-IS-DATA).

Test it with zero spend

Use a local model with a nonzero price in your overlay models.json, so the meter and the caps run as they would for a paid model (local model servers). Give it "compat": {"maxTokensField": "max_tokens"}, or the dollar cap refuses every call to it: Ollama ignores the field pi sends otherwise, so nothing would stop the answer at the output cap.

{"providers":{"local-ollama":{"api":"openai-completions","baseUrl":"http://host.docker.internal:11434/v1","apiKey":"$PI_DISPATCH_KEYLESS","compat":{"maxTokensField":"max_tokens"},"models":[{"id":"qwen2.5:3b","contextWindow":32768,"maxTokens":256,"cost":{"input":10,"output":6000,"cacheRead":0,"cacheWrite":0}}]}}}
  1. Copy the example to ~/pm, then git init, git add -A, git commit -m init.
  2. Set up the envelope above, with ~/pm a member of ops, and minIntervalHours 0 while you test, so one run can follow another.
  3. Set the trigger's "model" to the local model, and drop secrets.
  4. Set "flow": "portfolio-fixture", which copies plan.fixture.json with no judgement. Its "basis": null matches a deployment where no plan has applied yet. A small local model may answer without running the flow at all, so put the flow's one command in the task as well (the task line below). Run pi-dispatch run --trigger pm-weekly. The worker logs plan_collected with outcome applied, and the ALLOCATION view shows the fixture's split (shop $47.50, platform $35.00, ops $17.50) with writer portfolio-job.
  5. Set "flow": "portfolio-manager" and the task back, and run again. The report opens with Last plan: applied, and the new plan follows priorities.md. Mark a project "on fire", commit, and run again: its weight rises, or the step clamps it.
  6. Revert in the panel: b, then r on the first row. The next report shows the reverted split under "In force".
"task": "Call the bash tool once with this command: cat /job/portfolio.json && cp /workspace/plan.fixture.json /outbox/priorities.json; node /job/pi/skills/portfolio-manager/report.mjs . Then reply DONE."

The job log holds the runner's events, not what a command printed inside the job, so the report is not in it. To read it, run the script with --dry-run (it posts nothing) on the files the job left in its retained sandbox: PI_SANDBOX_DIR/<run>, where <run> is the job id with each : written as _. PI_SANDBOX_DIR defaults to <PI_JOBS_DIR>/sandboxes (sandbox).

node ~/pm/.pi/skills/portfolio-manager/report.mjs --dry-run --priorities ~/pm/priorities.md \
  --snapshot "$PI_SANDBOX_DIR/<run>/portfolio.json" --plan "$PI_SANDBOX_DIR/<run>/outbox/priorities.json"

Put minIntervalHours back afterwards. A hand edit of the envelope needs the digest step in allocation, or the host refuses its jobs as envelope-mismatch.

Reference

Piece Value
Example examples/portfolio-manager/
Trigger field run.portfolio (INT-TRIGGERS-FILE-CONTRACT)
Job files /job/portfolio.json (in), /outbox/priorities.json (out)
Report script /job/pi/skills/portfolio-manager/report.mjs, with --dry-run
Report secrets REPORT_GH_TOKEN, REPORT_WEBHOOK_URL
Report output report-sent: <channel> or report-not-sent: <reason>, exit code 0 always
Panel ALLOCATION view, key b; r on a history row reverts