Skip to content

Latest commit

 

History

History
29 lines (23 loc) · 2.67 KB

GREEN_LIGHTS.md

File metadata and controls

29 lines (23 loc) · 2.67 KB

Development green lights

GREEN means every requirement in the row has recorded evidence. AMBER means partial implementation or unavailable external prerequisites. PLANNED means not verified. Gates do not automatically grant business approval or imply production readiness.

Gate Conditions Required evidence
G0 — Repository GitHub fork verified; upstream SHA recorded; isolated branch; small commits; no secrets Fork URL, commit log, contribution inventory
G1 — Build Reproducible dependency resolution; support module and changed callers compile; appropriate tests pass Exact commands, dependency versions and test summaries
G2 — Read boundary Two tenants; authenticated access; bounded queries; forbidden/missing resources do not leak; explicit run scope PostgreSQL-backed authorization and query tests
G3 — Real investigation Actual configured model calls support tools and scoped runbook retrieval; valid evidence for repair/no-action/handoff Redacted real-model runs, model/config versions; no scripted substitutions
G4 — Controlled repair Immutable proposal; approval role and expiry; recheck access/version; one logical operation; transaction and verification Concurrency, stale approval, revoked access, rollback and response-loss checks
G5 — Second scenario API investigation shares run/evidence/UI without gaining write permission Specific error and incomplete-data cases, tool allowlist tests, reuse inventory
G6 — Evaluation Versioned development/held-out tasks; isolated trials; fair baseline; reproducible graders and raw outcomes Evaluation report; system tests separated from model results
G7 — Explainability Working demo; at least three labeled failure analyses; personally reproducible walkthrough Source map, contribution list, actual metrics and owner explanation

Hard stops

  • Cross-tenant disclosure or unapproved/stale repair blocks release regardless of aggregate score.
  • An unavailable configured model leaves G3 amber. Local Ollama needs no paid-model credentials; passing compatibility checks alone does not complete G3's real investigation requirements.
  • Unavailable upstream dependencies or infrastructure leave G1/G2 amber; record the original error instead of silently changing the claimed stack.
  • A draft PR may contain validated partial increments. Ready-to-review/product completion must say exactly which gates remain open.

Checkpoints

  1. Repository and reproducible build.
  2. Domain/read tools with tenant isolation.
  3. Controlled repair independently of model availability.
  4. Second scenario and evaluation scaffolding.
  5. Real-model and user validation after configuration.