This guide is for production floor operators using OpenMES on workstations or tablets.
- Logging In
- Selecting Your Line
- Your Work Queue
- Working on a Production Order
- Line Status Updates
- Using OpenMES on a Tablet (PWA)
- Tips for the Shop Floor
- Open your browser and go to the OpenMES URL (your admin will provide this, e.g.
http://192.168.1.100) - Enter your username and password
- Click Log in
If you forgot your password, contact your supervisor or system administrator — there is no self-service password reset.
After logging in, you are taken to the Line Selection screen.
- You will see a list of production lines you are assigned to
- Tap or click on your line
- You are now viewing the work queue for that line
Note: You can only see lines you have been assigned to. If your line is missing, contact your supervisor.
The work queue shows all accepted and in-progress production orders for your line, sorted by priority.
Each row shows:
- Order number — unique identifier
- Product name — what you are producing
- Quantity — how many units to produce
- Due date — when the order must be completed
- Status — current state of the order
- Progress — how many batches have been completed
Tap any order to open its detail page.
A batch represents one production run for an order. Large orders may have multiple batches (partial completions).
- Open an order from the queue
- You will see the process steps defined for this product
- Tap Start Batch to begin production
- Enter the quantity you plan to produce in this run
- Tap Confirm
The batch is now in progress. You will see each step you need to complete.
Steps must be completed in order (unless your admin has disabled sequential enforcement).
For each step:
- Read the step name and any instructions displayed
- Perform the operation
- Tap Complete Step when done
- Optionally add a comment or note
Once all steps are completed, the batch is marked Done and the work order quantity is updated automatically.
If something goes wrong during production, report it immediately:
- On the work order detail page, tap Report Issue
- Select the issue type from the list (e.g. Material shortage, Quality defect, Tool failure, Machine breakdown)
- Add a description explaining the problem
- Tap Submit
The issue is immediately visible to your supervisor. If the issue is marked critical, production on this order may be automatically blocked until the issue is resolved.
You can update the status of your line from the work order screen:
- Running — line is producing normally
- Changeover — setting up for a new product
- Breakdown — machine failure or critical issue
- Planned stop — scheduled maintenance or break
- Unplanned stop — unexpected stoppage
Keeping line status accurate helps supervisors monitor the shop floor in real time.
OpenMES can be installed as a Progressive Web App (PWA) on tablets for a native app-like experience.
- Open Safari and navigate to your OpenMES URL
- Tap the Share button (box with arrow)
- Scroll down and tap Add to Home Screen
- Tap Add to confirm
- Open Chrome and navigate to your OpenMES URL
- Tap the menu icon (⋮)
- Tap Install app or Add to Home Screen
- Tap Install
If the network goes down, OpenMES will:
- Continue to display the last loaded data
- Queue any actions you take (step completions, issue reports)
- Automatically sync when the connection is restored
A banner will appear at the top when you are offline.
- Large buttons — all touch targets are at least 48px for easy tapping with gloves
- Landscape mode — rotate your tablet to landscape for a wider view of the step list
- Auto-refresh — the work queue refreshes automatically; no need to reload manually
- Session timeout — for security, you will be logged out after a period of inactivity. Log in again when this happens
- Quick line switch — use the line selector at the top of the queue to switch between lines if you are assigned to multiple