Skip to content

Stop running transformer-level EP overlap tests pending removal (#4343) #3

Stop running transformer-level EP overlap tests pending removal (#4343)

Stop running transformer-level EP overlap tests pending removal (#4343) #3

Triggered via push August 27, 2026 04:23
Status Cancelled
Total duration 1d 0h 0m 11s
Artifacts –
Matrix: docker-build
Fit to window
Zoom out
Zoom in

Annotations

2 errors
docker-build (torchtitan-rocm-ubuntu-22.04-clang12, linux.2xlarge)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
docker-build (torchtitan-ubuntu-22.04-clang12, self-hosted, linux.2xlarge)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s